Service Contents
Phase 1: Concept Design (Japan-led)
- Market research, user interviews
- Design concept proposals (3-5 options)
- 3D rendering, prototype models
Phase 2: Mass Production Design (China-led)
- Material selection (leveraging Chinese domestic material suppliers)
- Mold and jig design
- Prototype → mass production process design
Phase 3: Mass Production Launch
- Prototype batch (100-1,000 units)
- Mass production preparation (from 10,000 units)
- Logistics, through to Amazon FBA delivery
Strengths
Speed of “Japanese Design × Chinese Manufacturing”
Typically, overseas design + overseas manufacturing takes 12-18 months. Toei Sosan’s Sino-Japan collaboration model enables mass production launch in 6-9 months.
One-Stop
No need to coordinate separate design, manufacturing, and logistics companies. Toei Sosan handles it end-to-end, avoiding communication loss.
Transparent Cost Structure
Three-stage quote: design fee + prototyping fee + mass production fee. No hidden costs.
Pricing Reference
- Concept design: from ¥30,000 JPY
- Mass production design: from ¥50,000 JPY
- Mass production launch: quote on request
See Services page or Contact for details.
Official service launch: June 1. Early consultation discount available.